Public Grievances • Feedback • Disclaimer
• 1. National Highways Fee (Determination of Rates and Collection) Rules 2008 [GSR 838 (E) dt. 05.12.2008]- Original • 2. National Highways Fee (Determination of Rates and Collection) Amendment Rules 2010 [GSR 950(E) 03.12.2010]-Revised exemption list from payment of fee • 3. National Highways Fee (Determination of Rates and Collection) Amendment Rules 2011 [GSR 15(E) 12.01.2011]-Commercial vehicles for toll plazas in registered district to be charged at 50% user fee • 4. National Highways Fee (Determination of Rates and Collection) Second Amendment Rules 2011 [GSR 756 (E) 12.10.2011] - Transition Plan from 1997 Fee Rules to 2008 Fee Rules • 5. National Highways Fee (Determination of Rates and Collection) Amendment Rules 2013 [GSR 778(E) 16.12.2013]-Penalty for overloading • 6. National Highways Fee (Determination of Rates and Collection) Amendment Rules 2014 [GSR 26(E) 16.01.2014] - Structures more than 60 m length • 7. National Highways Fee (Determination of Rates and Collection) Second Amendment Rules 2014 [GSR 831(E) 21.11.2014]- FASTag lane of toll plaza • 8. National Highways Fee (Determination of Rates and Collection) Third Amendment Rules 2014 [GSR 02(E) 29.12.2014]-Overloading penalty provision made applicable to all toll plazas • 9. National Highways Fee (Determination of Rates and Collection) Amendment Rules 2015 [GSR 220(E) 23.03.2015] tolerance upto 5% in gross vehicle weight and safe axle weight • 10. National Highways Fee (Determination of Rates and Collection) Amendment Rules 2016 [GSR 585(E) 08.06.2016]-on exemption from payment of user fee for specially designed vehicle for differently abled road users • 11. National Highways Fee (Determination of Rates and Collection) Amendment Rules 2016 [GSR 1114(E) 02.12.2016]-Prepaid payment instrument • Fee rules • Fee rules 1
Conceptualized and supported by NHAI, Developed and Designed by Comvision India Pvt. Ltd.